Pay in 4 interest-free payments of $9.99 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 10 - Aug 15
Pay in 4 interest-free payments of $9.99 Learn more
Ships within 48 hours · Estimated delivery Aug 10 - Aug 15
Please note: Returns will only be accepted if the items are returned in as new condition
4 Aspect Multi modern signal with One Touch OO/HO DCC Signal with left hand feather which shows point position if set to same address as point
Approximate size: 85mm long x 67mm deep x 50mm high
IVATT 2MT HISTORY
R40432 GNER Mk3 Trailer First Disabled (TFD) ‘41043’ Brand_Lionheart-Trains Please note: Returns will onlyIn order to allow running at 125 mph on Britain's Victorian era railways, new rollingstock was needed by British Railways. Significant improvements over the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe. Mk3 coaches are 75ft (23m) long enabling far greater capacity than older coaches. Mk3 coaches also incorporate disk brakes and wheel slip protection enabling faster
US$ 451.38
US$ 194.96
US$ 1545.87
US$ 178.90
US$ 465.60
US$ 470.64